نمونه سیستم آینه مجرای (duct mirror system)

From the industry standard to the leading edge, helping the world we live.

“DOKODEMO HIKARI MADO” (skylight window anywhere you like) sunlight transmission system *

(* Name of optical duct system manufactured with Mirror coat K. Trademark pending in Japan.)

This system incorporates natural light in the duct where the interior is a mirrored surface, and conducts light to locations where it is difficult to place windows using reflection.

Vertical duct system               Horizontal duct system

Horizontal duct system                                    Vertical duct system

Natural light for bathrooms and toilers on north side

Natural light for bathrooms and toilets on north side

For kitchens and living rooms

For kitchens and living rooms

Bright staircase using natural light

Bright staircase using natural light

This system employs highly reflective mirrors to guide natural light from openings in a building's walls and roof to interior spaces. It is an efficient method of utilizing natural energy since once installed it requires no additional resources in order to function.

The Toyota Motors Main Building uses this approach to introduce light to the basement cafeteria via an underground mirror duct.

Calculating CO2 reduction by installing “DOKODEMO HIKARI MADO”...

CO2 reduced by 0.029% of total discharge in Japan (2004)!


  Construc-
tion
Number
(#/Year)
Appli-
cation
(%)
Reduc-
tion
(kWh/
day)
Effec-
tive
Days
(Days
/Year)
Target Number
(No. of Ducts)
Years After Power
→ CO2 Coeffi-cient
(CO2-t/mWh)
CO2 Reduc-tion
(CO2-t/year)
Reduction Breakdown
    A B C D E A*B*C
*D*E
 
Detached
House
502000 3 1.3 365 15060 5 0.421 15,042 (Normally, 2.21 - 0.91 after measure) kWh
Apartment
Complex
202000 3 1.3 365 6060 5 0.421 6,053 (Normally, 2.21 - 0.91 after measure) kWh
Office Building 10000 m²
Class
- - 672 250 20 5 0.421 7,073 ((Normally, 0.02 kWh/m² - 0.008 kWh/m² after measures)
× 10000 m² × 0.7 (Target Floor Rate) × 8 (hrs/day))
5000-
9999
Class
- - 504 250 10 5 0.421 2,652 ((Normally, 0.02 kWh/m² - 0.008 kWh/m² after measures)
× 7500 m² × 0.7 (Target Floor Rate) × 8 (hrs/day))
School/
Hospital/
Clinic
School - - 4.8 200 30 5 0.421 61 ((Normally, 0.01 kWh/m² - 0.004 kWh/m² after measures)
× 100 m² × 8 hrs/day)
Hospital/
Clinic
- - 19.2 365 30 5 0.421 443 ((Normally, 0.01 kWh/m² - 0.004 kWh/m² after measures)
× 400 m² × 8 hrs/day)
Under-ground Facility Under-ground Facility - - 36 365 1 5 0.421 28 ((Normally, 0.015 kWh/m² - 0.006 kWh/m² after measures)
× 500 m² × 8 hrs/day)
Facility with Base-ments - - 14.4 250 70 5 0.421 530 ((Normally, 0.015 kWh/m² - 0.006 kWh/m² after measures)
× 200 m² × 8 hrs/day)
Under-ground Train Station - - 48 365 3 5 0.421 111 ((Normally, 0.02 kWh/m² - 0.008 kWh/m² after measures)
× 500 m² × 8 hrs/day)
Corridor Tunnel Mounding
Tunnel
- - 15.4 365 20 5 0.421 237 ((Normally, 3.2 kWh/m² - 1.28 kWh/m² after measures) × 8 hrs/day)
Trenching
Tunnel
- - 230 365 20 5 0.421 3,534 (Normally, 41 kWh × 8 hrs × 0.7 lighting rate)
Total   35,763

Construction results of “DOKODEMO HIKARI MADO”

1. Tokan Kogyo Co., Ltd./Osaka Facility

Lighting aperture

Lighting aperture

Light emitting element

Light emitting element

2. Toyo Institute of Food Technology

3. Toyo Seikan Group Corporate R&D

بازگشت به صفحه اصلی وبلاگ مهندسی عمران راه و ساختمان(مهندس حسن فراهانی)


برچسب‌ها: نمونه, سیستم, آینه مجرای, duct mirror system

ارسال توسط حسن فراهانی

اسلایدر